Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
    • Secure PDF 🔒
    • 👥
    • Immediate download
    • $67.00
    • Add to Cart
    • Printed Edition
    • Ships in 1-2 business days
    • $67.00
    • Add to Cart
    • Printed Edition + PDF
    • Immediate download
    • $87.00
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

Volume B30.16 includes provisions that apply to the construction, installation, operation, inspection, testing, and maintenance of overhead underhung and stationary hoists, including hand-chain-operated, electric-powered, and air-powered chain and wire rope hoists used for, but not limited to, vertical lifting and lowering of freely suspended, unguided loads that consist of equipment and materials.

Requirements for a hoist that is used for a special purpose, such as, but not limited to, tensioning a load, nonvertical lifting service, lifting a guided load, lifting personnel, or drawing both the load and the hoist up or down the load chain or rope when the hoist is attached to the load, are not included in this Volume.

 

Document History

  1. ASME B30.16-2022

    👀currently
    viewing


    Overhead Underhung and Stationary Hoists

    • Most Recent
  2. ASME B30.16-2017


    Overhead Underhung and Stationary Hoists

    • Historical Version
  3. ASME B30.16-2012


    Overhead Hoists (Underhung)

    • Historical Version
  4. ASME B30.16-2007


    Overhead Hoists (Underhung)

    • Historical Version
  5. ASME B30.16-2003


    Overhead Hoists (Underhung)

    • Historical Version
  6. ASME B30.16-1998


    Overhead Hoists (Underhung)

    • Historical Version