Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
    • Secure PDF 🔒
    • 👥
    • Immediate download
    • $150.00
    • Add to Cart
    • Printed Edition
    • Ships in 1-2 business days
    • $150.00
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

It is the purpose of the National Board Inspection Code (NBIC) to maintain the integrity of pressure-retaining items by providing rules for post-construction activities including installation, and by providing rules for post-installation activities including inspections, repairs, and alterations, thereby ensuring the safety of the pressure-retaining items’ continued use.

The NBIC is intended to provide rules, information, and guidance to manufacturers, jurisdictions, Inspectors, owner-users, installers, contractors, and other individuals and organizations performing or involved in post-construction activities, thereby encouraging the uniform administration of rules pertaining to pressure retaining items.

The NBIC recognizes four important areas of post-construction activities where information, understanding, and following specific requirements will promote public and personal safety. These areas include:

  • Installation
  • Inspection
  • Repairs and Alterations
  • Testing of Pressure Relief Devices

The NBIC provides rules, information, and guidance for post-construction activities, but does not provide details for all conditions involving pressure-retaining items. Where complete details are not provided in this Code, the Code user is advised to seek guidance from the applicable jurisdiction or other technical sources.

The NBIC is organized into four parts to coincide with specific post-construction activities involving pressure-retaining items. Each part provides general and specific rules, information, and guidance within each applicable post-construction activity. Individual NBIC parts or other published standards may contain additional information or requirements needed to meet the rules of the NBIC. Each part provides specific references to direct the user where to find this additional information.

  • Part 3, Repairs and Alterations – This part provides requirements and guidance to perform, verify, and document acceptable repairs or alterations to pressure-retaining items regardless of code of construction. Alternative methods for examination, testing, heat treatment, etc., are provided when the original code of construction requirements cannot be met. Specific acceptable and proven repair methods are also provided.
 

Document History

  1. NBBI NB23-2023 Part 3

    👀currently
    viewing


    National Board Inspection Code - NBIC, 2023 Edition - Part 3 - Repairs and Alterations

    • Most Recent
  2. NBBI NB23-2021 Part 3


    National Board Inspection Code - NBIC, 2021 Edition - Part 3 - Repairs and Alterations

    • Historical Version
  3. NBBI NB23-2019 Part 3


    National Board Inspection Code - NBIC, 2019 Edition - Part 3 - Repairs and Alterations

    • Historical Version
  4. NBBI NB23-2017 Part 3


    National Board Inspection Code - NBIC, 2017 Edition - Part 3 - Repairs and Alterations

    • Historical Version
  5. NBBI NB23-2015 Part 3


    National Board Inspection Code - NBIC, 2015 Edition - Part 3 - Repairs and Alterations

    • Historical Version
  6. NBBI NB23-2013 Part 3


    National Board Inspection Code - NBIC, 2013 Edition - Part 3 - Repairs and Alterations

    • Historical Version
  7. NBBI NB23-2011 Part 3


    National Board Inspection Code - NBIC, 2011 Edition - Part 3 - Repairs and Alterations

    • Historical Version
  8. NBBI NB23-2007 Part 3


    National Board Inspection Code - NBIC, 2007 Edition - Part 3 - Repairs and Alterations

    • Historical Version