Standards Store
Store Home   |    My Account   |    Help & Support   |    About IHS Markit   |    Contact IHS Markit   |    Sign In   
Standards Store Homepage TIA Standards Homepage Order online or call our sales team: 1-877-413-5184
 

GME TM 604700

2018 Edition, August 2018

Complete Document

General Requirements on Polyurethane Foam for Insulations

Includes all amendments and changes through Inactive Notice , August 2018


View Abstract
Product Details
Document History

Detail Summary

Active, Most Current

DE
EN
Additional Comments:
ENGLISH/GERMAN * INAC NO S/S * CONTAINS COLOR
Format
Details
Price (USD)
PDF
Single User
$66.00
Print
In Stock
$66.00
PDF + Print
In Stock
$105.60 You save 20%
Add to Cart

People Also Bought These:

GMW15272
GMW14194
GMW14650
GMW14444

Product Details:

  • Revision: 2018 Edition, August 2018
  • Published Date: August 2018
  • Status: Active, Most Current
  • Document Language: German, English
  • Published By: General Motors Europe (GME)
  • Page Count: 12
  • ANSI Approved: No
  • DoD Adopted: No

Description / Abstract:

The scope of this Standard is to specify the inter-Emergency Services Network interactions for initial emergency calls that are required to be routed to another Emergency Service Network and calls that may be transferred (bridged) between Emergency Services Networks. This Standard is incremental to ATIS-0500032 in that it focuses on the interactions between those networks. This Standard defines the Stage 2 (architecture) and Stage 3 (protocol) specifications to support the interconnection between Emergency Services Networks.

Purpose

IMS standards for Emergency Services have been under development and enhancement in 3GPP since 3GPP Release 9. However, from a Next Generation Emergency Services (NG9-1-1) network perspective, the IMS architecture only defined Emergency Service call processing for the originating network and has not specified the application of IMS architecture concepts to NG9-1-1 Emergency Services Networks or the interconnection of IMSbased NG9-1-1 Emergency Services Networks with legacy and other Next Generation NG9-1-1 Emergency Services Networks.

The purpose of this Standard is to define the Stage 2 (architecture) and Stage 3 (protocols) to enable the interconnection of North American IMS-based NG9-1-1 emergency services networks with other legacy and Next Generation Emergency Services Networks deployed in North America to support the delivery of initial and transferred emergency calls.