Hello. Sign In
Standards Store

ANS 2.10

2003 Edition, April 14, 2003

Complete Document

Criteria for the Handling and Initial Evaluation of Records from Nuclear Power Plant Seismic Instrumentation

Includes all amendments and changes through Change/Amendment , 2003


View Abstract
Product Details
Document History

Detail Summary

Not Active, See comments below

EN
Additional Comments:
W/D NO S/S
Format
Details
Price (USD)
Secure PDF
Single User
Call for Quote
Print
Backordered
Call for Quote
Add to Cart

Product Details:

  • Revision: 2003 Edition, April 14, 2003
  • Published Date: January 2003
  • Status: Not Active, See comments below
  • Document Language: English
  • Published By: American Nuclear Society (ANS)
  • Page Count: 16
  • ANSI Approved: Yes
  • DoD Adopted: No

Description / Abstract:

This standard provides criteria for the timely retrieval and the subsequent processing, handling, and storage of data obtained from seismic instrumentation specified in ANSI/ANS-2.2- 2002 [1].1) Also included are initial evaluation criteria to determine whether earthquake motion at the site has exceeded the plant's operatingbasis earthquake ground motion (OBE).

This standard does not address procedures for plant walkdowns immediately (within 8 hours) after an earthquake, for ensuring a safe and orderly shutdown, for long-term evaluations of the building and equipment response data, and for subsequently returning the plant to operation. These topics are addressed in ANSI/ANS- 2.23-2002 [2].

1) Numbers in brackets refer to corresponding numbers in Section 6, "References."