Hello. Sign In
Standards Store

API 533

1986 Edition, January 1, 1986

Complete Document

Air Preheat Systems for Fired Process Heaters



View Abstract
Product Details
Document History

Detail Summary

Not Active, See comments below

EN
Additional Comments:
W/D NO S/S
Format
Details
Price (USD)
Secure PDF
Single User
$129.00
Print
In Stock
$129.00
PDF + Print
In Stock
$219.30 You save 15%
Add to Cart

Product Details:

  • Revision: 1986 Edition, January 1, 1986
  • Published Date: January 1986
  • Status: Not Active, See comments below
  • Document Language: English
  • Published By: American Petroleum Institute (API)
  • Page Count: 60
  • ANSI Approved: No
  • DoD Adopted: No

Description / Abstract:

This recommended practice provides guidelines fir the selection and/or evaluation of air preheat systems applied to process heaters. Details of fired heater design are considered only where they interact with the air preheat system design. This recommended practice does not provide rules for design but indicates areas that need attention and offers calculation methods to check the suitability of systems or equipment.

The systems discussed in detail are those currently in common use in the industry and it is not intended to imply that other systems are not recommended. Many of the individual features dealt with in these guidelines will be applicable to any type of air preheat systems