Hello. Sign In
Standards Store
CSA CAN3-N287.6 Revision 80M, 1980
Complete Document
Superseded By: CSA N287.6
PRE-OPERATIONAL PROOF AND LEAKAGE RATE TESTING REQUIREMENTS FOR CONCRETE CONTAINMENT STRUCTURES FOR CANDU NUCLEAR POWER PLANTS
Includes all amendments and changes through Revision Page(s) , April 1982
Additional Comments: W/D S/S BY CSA N287.6
Published By:CSA Group (CSA)
Page Count:0
Print  :
$102.00 USD
Backordered
CSA B51
There is no abstract currently available for this document