Hello. Sign In
Standards Store

CSA N287.6

4th Edition, January 1, 2011

Complete Document

Pre-operational proof and leakage rate testing requirements for concrete containment structures for nuclear power plants

Includes all amendments and changes through Reaffirmation Notice , 2016


View Abstract
Product Details
Document History

Detail Summary

Active, Most Current

EN
Format
Details
Price (USD)
PDF
Single User
$331.00
Print
In Stock
$351.00
Add to Cart

People Also Bought These:

ACI 318
ANSI/ASA S1.13
ANSI/HI 1.3
ANSI/HI 11.6

Product Details:

  • Revision: 4th Edition, January 1, 2011
  • Published Date: January 2016
  • Status: Active, Most Current
  • Document Language: English
  • Published By: CSA Group (CSA)
  • Page Count: 38
  • ANSI Approved: No
  • DoD Adopted: No

Description / Abstract:

This Standard specifies requirements for pre-operational proof and leakage rate testing of concrete containment structures of a containment system that are designated as class containment components.

Note: Other components and appurtenances of the containment system may be tested coincident with the tests specified in this Standard provided that the intent of this Standard is observed and the requirements of CSA N285.0 are considered. 

In CSA standards, “shall” is used to express a requirement, i.e., a provision that the user is obliged to satisfy in order to comply with the standard; “should” is used to express a recommendation or that which is advised but not required; and “may” is used to express an option or that which is permissible within the limits of the standard.

Notes accompanying clauses do not include requirements or alternative requirements; the purpose of a note accompanying a clause is to separate from the text explanatory or informative material.

Notes to tables and figures are considered part of the table or figure and may be written as requirements.

Annexes are designated normative (mandatory) or informative (nonmandatory) to define their application.

CSA B51