Hello. Sign In
Standards Store

DIN 18312

2016 Edition, September 1, 2016

Complete Document

German construction contract procedures (VOB) - Part C: General technical specifications in construction contracts (ATV) - Underground construction work



View Abstract
Product Details
Document History

Detail Summary

Active, Most Current

EN
Additional Comments:
ENGLISH
Format
Details
Price (USD)
PDF
Single User
$71.00
Print
In Stock
$78.00
Add to Cart

Product Details:

  • Revision: 2016 Edition, September 1, 2016
  • Published Date: September 2016
  • Status: Active, Most Current
  • Document Language: English
  • Published By: Deutsches Institut fur Normung E.V. (DIN)
  • Page Count: 19
  • ANSI Approved: No
  • DoD Adopted: No

Description / Abstract:

This standard deals with the excavation and extraction of soil and rock, using sub-surface and cut-and-cover techniques, for the construction of underground cavities in soil and rock (e.g. adits, tunnels, caverns, shafts) which are not directly intended for the extraction of minerals.

It includes the breaking, loading and haulage of soil and rock, the supporting of the cavity underground, and the collection, treatment and discharge of water up to the assigned discharge point. It also applies to supporting work in cases where this also serves to permanently line the cavities.

This standard does not cover 

- borehole sinking operations (see DIN 18302), 

- trenchless pipelaying (see DIN 18319).

DIN 18299, clauses 1 to 5 shall also apply. In cases where the specifications of DIN 18299 contradict the present standard, DIN 18312 shall take precedence.