Hello. Sign In
Standards Store

DOD 4245.7M

1985 Edition, September 1985

Complete Document

TRANSITION FROM DEVELOPMENT TO PRODUCTION CHG NOT 1 - 02/13/89

Includes all amendments and changes through Change 1, February 13, 1989


View Abstract
Product Details
Document History

Detail Summary

Active, Most Current

EN
Format
Details
Price (USD)
PDF
Single User
$65.00
Print
In Stock
$72.00
PDF + Print
In Stock
$95.90 You save 30%
Add to Cart

Product Details:

  • Revision: 1985 Edition, September 1985
  • Published Date: February 13, 1989
  • Status: Active, Most Current
  • Document Language: English
  • Published By: National Technical Information Service (NTIS)
  • Page Count: 175
  • ANSI Approved: No
  • DoD Adopted: No

Description / Abstract:

INTRODUCTION

An often discussed aspect of the acquisition process in the Department of Defense is the length of time it takes to develop and deploy weapon systems. Although there have been numerous attempts to shorten this cycle, relatively little has been accomplished. The cycle has grown longer and the criticism stronger.

The reasons for shortening the cycle are directed mainly toward cost, and to some extent - though not enough - toward readiness. However, in the past few years, the issue of readiness has rightfully gained visibility and importance. Although the long acquisition cycle certainly is not a desirable situation, it might be tolerable if the process yielded satisfactory results. But most new weapon systems are less than satisfactory and require burdensome maintenance and logistics efforts. Even with the best of efforts, resultant low readiness often requires additional equipment in order to meet the needs of the Military Services. This is due primarily to a lack of discipline in addressing logistics requirements during design and development.