Hello. Sign In
Standards Store

DOD-STD-2003-3

1987 Edition, December 17, 1990

Complete Document

ELECTRIC PLANT INSTALLATION STANDARD METHODS FOR SURFACE SHIP AND SUBMARINES (PENETRATIONS) SECTION 3 OF 5 SECTIONS

Includes all amendments and changes through Notice 1, December 17, 1990


View Abstract
Product Details
Document History

Detail Summary

Superseded By: MIL-STD-2003-3

EN
Additional Comments:
RENUMBERED AS MIL-STD-2003-3
Format
Details
Price (USD)
PDF
Single User
$59.00
Print
In Stock
$65.00
PDF + Print
In Stock
$86.80 You save 30%
Add to Cart

Product Details:


Description / Abstract:

This section specifies the requirements for swage tubes, stuffing tubes and kickpipe methods to be employed both on surface ships and submarines. Standard methods identified for electric plant installation are intended for new construction only.