Hello. Sign In
Standards Store
Look Inside

IEC 60609-2

1st Edition, November 1, 1997

Complete Document

Cavitation Pitting Evaluation in Hydraulic Turbines, Storage Pumps and Pump-Turbines - Part 2: Evaluation in Pelton Turbines



Detail Summary

Active, Most Current

EN
FR
Additional Comments:
BILINGUAL
Format
Details
Price (USD)
PDF
Single User
$82.00
Print
In Stock
$82.00
Add to Cart

People Also Bought These:

IEC 60609-1

Product Details:

  • Revision: 1st Edition, November 1, 1997
  • Published Date: November 1997
  • Status: Active, Most Current
  • Document Language: English, French
  • Published By: International Electrotechnical Commission (IEC)
  • Page Count: 40
  • ANSI Approved: No
  • DoD Adopted: No

Description / Abstract:

Scope and object

This part of IEC 60609 serves as a basis for the formulation of guarantees on cavitation pitting on Pelton turbine runners and also for the measurement and evaluation of the amount of cavitation pitting on Pelton turbine runners of a given turbine, which is defined in the contract by power, specific hydraulic energy of machine (head), rotational speed, material, operation, etc.

The sequence of clauses in this part of IEC 60609 is the same as in IEC 60609 (1978). The clauses on measurements and evaluation of the amount of cavitation pitting are practically identical to those of IEC 60609. Evaluation has to be based on the loss of material during a given time and under accurately defined operating conditions.

Guarantees which restrict the extent of cavitation pitting and drop erosion on Pelton turbines at the end of an operating period specified in the contract are necessary when cavitation pitting is expected in all or in some operating ranges. Such guarantees should include limits for operation which are consistent with specified operating conditions.