Hello. Sign In
Standards Store
IEEE 336 2010 Edition, June 17, 2010
Complete Document
Active, Most Current
Recommended Practice for Installation, Inspection, and Testing for Class 1E Power, Instrumentation, and Control Equipment at Nuclear Facilities
PDF :
$77.00 USD
In Stock
Print  :
$96.00 USD
In Stock
This guide provides considerations for the pre-installation, installation, inspection, and testing of Class 1E power, instrumentation, and control equipment and systems of a nuclear facility while in the process of installing, inspecting, and testing during new construction, modification, and maintenance. This guidance is applicable to initial construction, modification (backfit), and maintenance activities. This guide does not apply to periodic testing.

Purpose

The purpose of this recommended practice is to identify the activities, instructions, and attributes that should be considered in the process of installing, inspecting, and testing during new construction, modification, and maintenance for Class 1E power, instrumentation, and control equipment at nuclear facilities.