Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
    • Printed Edition
    • Ships in 1-2 business days
    • $104.00
    • Add to Cart
    • Printed Edition + PDF
    • Immediate download
    • $120.00
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

Scope

This guide covers the diagnostic testing of new or service-aged, installed shielded power cable systems, which include cable, joints, and terminations, using electrical partial discharge (PD) detection, measurement, and location. PD testing, which is a useful indicator of insulation degradation, may be carried out online or by means of an external voltage source. This guide does not cover the testing of compressed gas insulated cable or termination systems

Purpose

This guide describes diagnostic methods capable of detecting and locating PD from defects and damage in installed shielded power cable systems. The results of PD tests can be used to assess the condition of cables and accessories.

Abstract

Revision Standard - Active. The diagnostic testing of new or service-aged, installed shielded power cable systems, which include cable, joints, and terminations, using electrical partial discharge (PD) detection, measurement, and location is covered by this guide. PD testing, which is a useful indicator of insulation degradation, may be carried out online or by means of an external voltage source. The testing of compressed gas insulated cable or termination systems is not covered by this guide.
 

Document History

  1. IEEE 400.3-2022

    👀currently
    viewing


    IEEE Guide for Partial Discharge Field Diagnostic Testing of Shielded Power Cable Systems

    • Most Recent
  2. IEEE 400.3-2006


    IEEE Guide for Partial Discharge Testing of Shielded Power Cable Systems in a Field Environment

    • Historical Version