Guide for Planning of Preoperational Testing Programs for Class 1E Power Systems for Nuclear Power Generating Stations

Includes all amendments and changes through Reaffirmation Notice , 1992


View Abstract
Product Details
Document History

Detail Summary

Not Active, See comments below

EN
Additional Comments:
W/D NO S/S * ONLY AVAILABLE IN ELECTRONIC FORMAT
Format
Details
Price (USD)
PDF
Single User
$85.00
Add to Cart

Product Details:


Description / Abstract:

This guide provides guidance for the planning of preoperational test programs for Class IE Power Systems for nuclear power generating stations. The extent of the systems shall be that covered by ANSI/IEEE Std 308-1980, IEEE Standard Criteria for Class IE Power Systems for Nuclear Power Generating Stations. An example system is illustrated in ANSI/IEEE Std 308-1980 [2],1 Fig 1. The power systems are considered to include the ac and dc power supplies, but do not include the equipment which utilizes the ac and dc power.

Purpose

The purpose of this guide is to provide direction for establishing an acceptable preoperational testing program for Class IE Power Systems in nuclear power generating stations. The preoperational tests are performed after the appropriate construction tests have been com· pleted. The purpose of preoperational tests is to verify that the Class IE Power Systems perform their required function as designed.