Hello. Sign In
Standards Store
MIL-D-46688 Revision A, April 30, 1965
Complete Document
Active, Most Current
DEMOLITION KIT, PROJECTED CHARGE, M173, AND PRACTICE, M174 LOADINGASSEMBLING AND PACKING
Includes all amendments and changes through Validation Notice 3, October 25, 2013
Additional Comments: INACTIVE FOR NEW DESIGN
PDF :
$31.00 USD
In Stock
Print  :
$34.00 USD
In Stock
Print + PDF :
$45.50 USD
You save 30%
In Stock
This specification covers quality assurance requirements, and special requirements not covered by the drawings, pertaining to the loading and assembling of one type of mine clearing device designated as Demolition Kit, Projected Charge, M173 or Practice, M174.