Hello. Sign In
Standards Store
Look Inside

PIP STS02380

2017 Edition, January 1, 2017

Complete Document

Application of ACI 336.1-01, Specification for the Construction of Drilled Piers



View Abstract
Product Details
Document History

Detail Summary

Active, Most Current

EN
Format
Details
Price (USD)
Secure PDF
Single User
$100.00
Print
In Stock
$100.00
PDF + Print
In Stock
$160.00 You save 20%
Add to Cart

People Also Bought These:

ASME BPVC-IX
ASME BPVC-VIII-1
ASME BPVC-II DM
ASME BPVC-V

Product Details:

  • Revision: 2017 Edition, January 1, 2017
  • Published Date: January 2017
  • Status: Active, Most Current
  • Document Language: English
  • Published By: Process Industry Practices (PIP)
  • Page Count: 9
  • ANSI Approved: No
  • DoD Adopted: No

Description / Abstract:

This Practice supplements ACI 336.1-01, Specification for the Construction of Drilled Piers. Together, this Practice and ACI 336.1-01 provide requirements for drilled pier construction.

The requirements of ACI 336.1-01, as modified and supplemented by this Practice, are adopted by this Practice for the construction of drilled piers. Common industry terminology may also refer to drilled piers as caissons or drilled shafts.