Hello. Sign In
Standards Store
SAE AMS2375 Revision D, June 1, 2007
Complete Document
Active, Most Current
Control of Forgings Requiring First Article Approval
Includes all amendments and changes through Reaffirmation Notice , April 2012
Page Count:6
PDF :
$74.00 USD
In Stock
Print  :
$74.00 USD
In Stock
AIA/NAS Aerospace Standards
Purpose

This specification covers procedures for obtaining first-article (preproduction) approval of forgings and the controls to be exercised in producing subsequent production forgings.

Application

This procedure has been used typically for forgings which require preproduction approval and where assurance is required that production lots are of essentially the same metallurgical quality and are produced by the same basic procedures as the forging originally qualified.