Hello. Sign In
Standards Store


Revision B, December 1, 2012

Complete Document

Universal Turnover Build-Up Stand for Small Propulsion Units Requiring Vertical Assembly

Includes all amendments and changes through Stabilization Notice (No longer revised / updated) , December 2012

View Abstract
Product Details
Document History

Detail Summary

Active, Most Current

Price (USD)
Single User
In Stock
Add to Cart

Product Details:

  • Revision: Revision B, December 1, 2012
  • Published Date: December 2012
  • Status: Active, Most Current
  • Document Language: English
  • Published By: SAE International (SAE)
  • Page Count: 9
  • ANSI Approved: No
  • DoD Adopted: No

Description / Abstract:

This recommended practice covers a stand that may be used for assembly, disassembly, and maintenance. The standard incorporates the following design criteria: complete interchangeability of any and all components, collapsible frame construction, envelope dimensions (marked with an asterisk on the attached drawings), attachment pad configuration, and gearbox and caster specification.


The purpose of this ARP is to provide a recommended practice for the design of a build-up stand which will be adaptable to small propulsion units (requiring vertical assembly) and/or all propulsion unit components.
AIA/NAS Aerospace Standards