Hello. Sign In
Standards Store




SAE ARP863

Revision B, December 1, 2012

Complete Document

Universal Turnover Build-Up Stand for Small Propulsion Units Requiring Vertical Assembly

Includes all amendments and changes through Stabilization Notice (No longer revised / updated) , December 2012


View Abstract
Product Details
Document History

Detail Summary

Active, Most Current

EN
Format
Details
Price (USD)
PDF
Single User
$78.00
Print
In Stock
$78.00
Add to Cart

Product Details:

  • Revision: Revision B, December 1, 2012
  • Published Date: December 2012
  • Status: Active, Most Current
  • Document Language: English
  • Published By: SAE International (SAE)
  • Page Count: 9
  • ANSI Approved: No
  • DoD Adopted: No

Description / Abstract:

This recommended practice covers a stand that may be used for assembly, disassembly, and maintenance. The standard incorporates the following design criteria: complete interchangeability of any and all components, collapsible frame construction, envelope dimensions (marked with an asterisk on the attached drawings), attachment pad configuration, and gearbox and caster specification.

Purpose:

The purpose of this ARP is to provide a recommended practice for the design of a build-up stand which will be adaptable to small propulsion units (requiring vertical assembly) and/or all propulsion unit components.
AIA/NAS Aerospace Standards