Hello. Sign In
Standards Store




PIP CVS02100

2001 Edition, May 2001

Complete Document

Site Preparation, Excavation, and Backfill Specification



Format
Details
Price (USD)
Print
In Stock
Call for Quote
Add to Cart

Product Details:

  • Revision: 2001 Edition, May 2001
  • Published Date: May 2001
  • Status: Historical
  • Document Language: English
  • Published By: Process Industry Practices (PIP)
  • Page Count: 19
  • ANSI Approved: No
  • DoD Adopted: No

Description / Abstract:

This Practice describes the requirements for excavation, placement, inspection, and management of earthen and organic materials during the site preparation, excavation, and backfill phase of a construction project.

For excavation and backfill specifications for underground pipes, see PIP CVS02700.

Any conflicts or inconsistencies between this Practice and the Contract Documents shall be brought to the attention of the Owner for resolution. If inconsistencies exist between the requirements of this Practice and those of the Contract Documents, the more stringent requirements shall apply.

Excavation and backfill requirements from PIP CVS02315 have been incorporated into this Practice; therefore, PIP CVS02315 is now obsolete.

This document is a complete revision of PIP CVS02100, and therefore revision markings are not provided.

Purpose

This Practice provides the Contractor with site preparation, excavation, and backfill requirements.